Projects

RECENT PROJECTS

SB-SG-L3 expansion

Cleanroom fit-out at L3, Level 3 Expansion Project- Electrical Work Package

Silicon Box Pte Ltd | Semiconductor

Apr 2026 – Nov 2026

Installation of LED lights and fittings – Strides

Strides Engineering Pte Ltd | Railway

Feb 2026 – Jun 2026

Solar Photovolataic project for Roof Package at SBAB

A grid connected photovaltaic power systems with a nominal capacity of 21.89MWp at SBAB and Dieppe barrrack

Sembcorp Solar Singapore Pte Ltd | Solar PV

Nov 2025- Dec 2026

Kandenko – Changi East Depot

Supply, Engineering, Delivery, Installation, Testing and Commissioning of Electrical Works for Contract CR175A Supply and Installation of Electrical Services For Changi East Depot.

Kandenko Co., Ltd | Railway

Jan 2027- Dec 2029

Guthrie Engineering – installation of EV Charger

Supply & Installation of EV Charger at Ulu Pandan Depot

Guthrie Engineering (S) Pte Ltd | Building

Dec 2025 – Jun 2026

Tekscend Photomask – Cleanroom

Additions and alterations to existing 2-storey single-user industrial building with clean room facilities and ancillary office involving addition of 1 no. of new built-in genset diesel tank (1500 litres) with no pump points on Lot 02406T MK 29 at 30 Tampines Industrial Avenue 3

Tekscend Photomask Singapore Pte. Ltd. | Plant

Nov 2025- Dec 2026

Installation of Video Surveillance System for NSEWL

Installation of video surveillance system for North-South and East-West lines

Strides Engineering Pte Ltd | Railway

Jun 2026 – Jun 2030

RTS Woodlands

DESIGN, MANUFACTURE, DELIVERY, TESTING & COMMISSIONING, INTERFACING, WARRANTY AND OTHER RELATED WORKS Of COMMUNICATIONS SYSTEM (COMMS) FOR RAPID TRANSIT SYSTEM (RTS) ASSETS FOR RTS LINK BETWEEN MALAYSIA – SINGAPORE

H A S Energy Industrial (M) Sdn Bhd | Infrastructure

Mar 2025 – Feb 2026

BESS Kallang

Design, Engineering, Procurement, Construction, Testing and Commissioning of a 9.6MW/12MWh grid-tied Battery Energy Storage System (BESS) at SPPA Kallang Industry 22kV Substation

SP Energy Services Pte. Ltd | Energy Storage System

Feb 2025 – Jun 2025

Sembawang Airbase

Turnkey Engineering, Procurement, Construction, Installation and Commissioning

Sembcorp Solar | Solar PV

20 Jan 2025 – 31 Dec 2030

BESS Banyan

Engineering, Procurement, Construction (EPC) Services for Battery Energy Storage System (BESS) In Banyan, Jurong Island, Singapore

Sembcorp Cogen Pte Ltd | Energy Storage System

Nov 2024 – Oct 2025

Novartis

To Supply Work, Labour and Materials

Kurihara Kogyo Co Limited | Healthcare

Apr 2024 – Dec 2025

Intel Pelican (Penang) – HK26D_Indirect

HK26D Electrical and ELV System

Exyte Malaysia Sdn Bhd | Semiconductor

Mar 2024 – Sep 2024

JI – Plot 5-6 Solar Farm

Construction of Solar Photovoltaic Project at Jurong Island

China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd | Solar PV

Feb 2024 – Oct 2024

Daikin

Fit-out Works Including Electrical Works

Daikin | Building

Jan 2024 – Sep 2024

Novena – J342 MHA

Additions and Alterations works at Ministry of Home Affairs

Gammon | Building

Oct 2023 – Jan 2024

Micron DVR

Cabling and Termination Work

Micron | Semiconductor

Aug 2023 – Jun 2024

C853E CCL6

CCL6 3 Stations CC30 CC31 and CC32 Power Supply Installation and Commissioning

Siemens | Railway

Aug 2023 – Dec 2024

Soitec

Design, Supply and Installation of Electrical System for SOITEC Pasir Ris Project

Soitec | Semiconductor

Jan 2024 – Dec 2024

New AMAT TIC Building & Exisiting APC Building L2 SOC Facility Boxes

Supply, Fabricate and Deliver Facility Boxes for New Building (Phase 1) Works

Applied Materials | Semiconductor

Nov 2023 – Jun 2024

NUS Pneumatics – Deep Water Ocean Basin System

Supply and Installation of Electrical and Air-Compressor System Works

National University of Singapore | Building

Aug 2018 – Jul 2020

AMAT Extension Building & Data Center

Supply and Installation of Builder, Mechanical, Electrical and Misc. Works

Applied Materials | Semiconductor

Feb 2020 – Ongoing

Jurong Island Desalination Plant

Supply and Installation of Electrical and Instrumentation System

Public Utilities Board | Water Treatment

Nov 2020 – May 2023

Globalfoundries Fab7H

General Electrical Works

GLOBALFOUNDRIES | Semiconductor

Dec 2021 – May 2023

STMicroelectronics – SG Fab AMJ9 F1 Phase III Purion Cleanroom

Supply and Installation of Electrical Works

STMicroelectronics | Semi-con

Aug 2022 – June 2023

Siltronic Fab NEXT – F16A-1 & F16A-3

Supply and Installation of Electrical Works

Siltronic | Semi-con

Nov 2022 – May 2023

Global Switch’s Singapore Data Centre

Supply and Installation of Cable Supporting System including HT riser, HT cable, Pilot Cable Installation, Termination and including Testing and Commissioning works. Proposed 6-Storey Single User Data Centre with Underground Fuel Storage Tanks on Plot A0066100 Lot 5685A MK 13 At Woodlands Avenue 12 (Woodlands Planning Area)

Global Switch | Data Centre

Jan 2018 – Oct 2018

T275A Supply and Installation of Electrical Services for Mandai Depot

Installation of Electrical Services

LTA | Railway

Sep 2017 – Mar 2019

R152 – Track Circuit Refurbishment Works for North South East West Line

Supply and Installation of Works for Track Circuit Refurbishment Works

SMRT | Railway

Oct 2018 – Jun 2021

Qualcomm

Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

Qualcomm | Semi-con

Jun 2014 – Dec 2020

T275C Supply and Installation of Electrical Services for Thomson-East Coast Line Stage 3

Supply and Installation of Electrical Works for T275C (TE14 &TE 20)

LTA | Railway

Jun 2018 – Dec 2022

X-FAB 40K Expansion at Same Jaya Free Trade Zone, Kuching Sarawak

Design, Supply, Installation Testing and Commissioning for Electrical, Instrument and Control System Works

X-FAB | Semi-com

Mar 2023 – Apr 2024

Energy and Water Monitoring at Marina South Pier

Supply and Installatation of Energy and Water Monitoring at Marina South Pier, Inclusive of 5-Year Comprehensive Maintenance Contract

Maritime and Port Authority of Singapore | Monitoring system

Feb 2022 – Feb 2027

HydroElectric Power Plant at Aceh, Indonesia

Supply and Installation for Electrical and Mechanical Works

Peusangan Hydroeletric Power Plant | HydroElectric

Dec 2022 – Jun 2023

Rack Central Data Centre

Electrical Works for New Generators

Rack Central | Data Centre

Sep 2022 – Jun 2023

Reinstatement work to KPMG offices at Hong Leong Building

Reinstatement to builder, electrical and ACMV works

Hong Leong Finance | Building

Aug 2022 – Jun 2023

Paragon Shopping Centre A&A Works

Supply and Installation for Electrical Works

Paragon | Building

Jan 2023 – May 2023

Micron Semiconductor Asia Pte Ltd – Tools Hook Up and Construction Phase

Supply & Install electrical supporting works, fit-up and hook-up of equipment, HT cabling works

Mircon Plantconductr Asia Pte Ltd | Semi-con

Feb 2016 – Mar 2023

Proposed Fit Out Works to the 4th Storey at Existing 5 Storey Single User Factory for ASM Front End Manufacturing (SG) Pte Ltd

Supply and Installation of Electrical Works

ASM Front End Manufacturing (SG) Pte Ltd | Semi-con

Apr 2022 – Dec 2022

Sembcorp Energy Storage System 200MW/200MHh- Sakra and Banyan

Electrical Works

Sembcorp | Energy storage system

November 2022

CCD (Singapore) Pte Ltd

Electrical and Instrumentation Cable Pulling Works

CCD (Singapore) Pte Ltd | Oil & Gas

Aug 2021 – Feb 2022

C9355 – Solar System for Gali Batu Depot

Supply and Installation of Solar System

LTA | Solar PV

Jan 2021 – Dec 2021

Kranji Water Reclamation Plant

Installation of High Tension Cable, Pilot cable and supporting system installation works

PUB | Water Treatment

Dec 2019 – Dec 2021

SolarNova3- Selected Projects

To design, install, test and commission serveral roof mounted photovoltaic power system under HDB Solarnova 3 Project

MOE | Solar PV

Mar 2019 – Dec 2021

Solar Nova 2 – Palm View Primary School

Supply & Install AC & DC Cabling and Supporting System Works

MOE | Solar PV

Jun 2020 – Sep 2021

RF360 – New & Existing Cabling Dismantling & Diversion Works

Supply and Installation of Electrical Works

RF360 Singapore Pte Ltd | Semi-con

Feb 2020 – Jul 2021

Kerry Logistic (Various Site)

Supply & Install M&E for A&A and maintenance works

Kerry Logistics Centre | Warehouse

Oct 2014 – Jun 2021

CBTKD – Purpose Built Dormitory at Jalan Tukang

Design and Installation of Electrical Works

Jurong Town Corporation | Building

Apr 2020 – Apr 2021

ST AMK – AMJ9 F4 EP Upgrading Works

Supply and Installation of Electrical Works

ST Electronics | Semi-con

Feb 2020 – Jul 2020

Redlion Schenker

To install, test and commission serveral roof mounted photovoltaic power system

DB Schenker Red Lion | Warehouse

May 2019

Installation works of PV System for Grid-tied Solar Photovoltaic System for Vivocity

Supply and Installation of Solar Photovolaic System Works

Mapletree Investment | Solar PV

Aug 2018 – Dec 2018

Flextronic Additional and Alteration Works

Supply and Installation of electrical works

Flex Ltd | Semi-con

Jun 2018 – Jun 2018

Equinix @ Ayer Rajah Data Centre Additional and Alteration Works

Installation of Electrical Works

Equinix | Data Centre

Apr 2018 – Jun 2018

Shell Petrol Station Upgrading Works

Supply and Installation of electrical works

Shell plc | Oil & Gas

Nov 2017 – May 2018

3M Tuas – SG9 Line Process Electrical Installation

Supply & Install electrical supporting works, fit-up and hook-up of equipment

3M | Warehouse

Oct 2016 – May 2018

Upgrading Earthing System at M/S The Valspar (Singapore) Corporation Pte Ltd

Earth Rite Plus P2 Static Grounding System Insallation Services

The Valspar (Singapore) Corporation Pte Ltd | Building

Nov 2017 – Dec 2017

Guthrie FMC – A&A

Supply & Install electrical works for Dock Leveler at Bay1 Repair works

Guthrie Engineering | Building

September 2017

DBS Bank

Supply & Install for Electrical Works

DBS Bank | Building

Apr 2017 – Aug 2017

Linde Gas

Supply & Install Instrumentation works

Linde Gas | Oil & Gas

July 2017

RF360K3

Supply & Installation of Electrical Services for hook-up of equipment

Qualcomm | Semi-con

Feb 2017 – Jun 2017

Second Changi NEWater Plant

Supply & Installation for instrumentation works

PUB | Water Treatment

Apr 2016 – Oct 2016

Telin Singapore

Supply & Install for Electrical Works

Telin Singapore | Data Centre

Jun 2016 – Aug 2016

Abbott Singapore

Supply & Install Instrument Valve for A&A works

Abbott Singapore |

Sep 2015 – Feb 2016

Schlumberger

Modification on existing panel wiring

Schlumberger Limited | Building

Nov 2015 – Nov 2015

ASM

Supply & Install M&E for A&A and maintenance works

ASM | Semi-con

Sep 2014 – Mar 2015

Ardentec

Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

Ardentec | Semi-con

Sep 2014 – Mar 2015

Fluidigm

Supply & Install M&E for new lab works and BMS System

FLUIDIGM SINGAPORE PTE LTD | Building

Sep 2014 – Mar 2015

Grid-tied Solar Photovoltaic (PV) System at Aims Reit sites and Properties Project

Supply Material and Labour for Installation Rooftop Photovoltaic System Works

AIMS APAC REIT | Solar PV

Oct 2022 – May 2023

Tee Yih Jia

Supply & Install for Electrical Works

Tee Yih Jia Food Manufacturing Pte Ltd | Building

July 2014 – Sep 2014

TR286 – Design, Supply and Installation of Fixed Water-based Fire Fighting System for KPE & CTE

Supply and Installation of Electrical, Surveillance and Control Works

LTA | Tunnel

Aug 2018 – Dec 2022

Sembcorp Energy From Waste @ Sakra

Supply & Installation for electrical works at Chimneys, to provide works, services, equipment & construction resources for the Electrical and C&I Erection Work

Sembcorp | Energy from Waste

Mar 2015 – Apr 2018

Grid-Tied Solar Photovoltaic System at SPPA Substation Site and Properties Project (Phase-1A)

Supply Material and labour for Installation Rooftop Photovoltaic System Works

SP Group | Solar PV

Mar 2023 – Aug 2023

  • SB-SG-L3 expansion

    Cleanroom fit-out at L3, Level 3 Expansion Project- Electrical Work Package

    Silicon Box Pte Ltd | Semiconductor

    Apr 2026 - Nov 2026

    Installation of LED lights and fittings – Strides

    Strides Engineering Pte Ltd | Railway

    Feb 2026 - Jun 2026

    Solar Photovolataic project for Roof Package at SBAB

    A grid connected photovaltaic power systems with a nominal capacity of 21.89MWp at SBAB and Dieppe barrrack

    Sembcorp Solar Singapore Pte Ltd | Solar PV

    Nov 2025- Dec 2026

    Kandenko – Changi East Depot

    Supply, Engineering, Delivery, Installation, Testing and Commissioning of Electrical Works for Contract CR175A Supply and Installation of Electrical Services For Changi East Depot.

    Kandenko Co., Ltd | Railway

    Jan 2027- Dec 2029

    Guthrie Engineering – installation of EV Charger

    Supply & Installation of EV Charger at Ulu Pandan Depot

    Guthrie Engineering (S) Pte Ltd | Building

    Dec 2025 - Jun 2026

    Tekscend Photomask – Cleanroom

    Additions and alterations to existing 2-storey single-user industrial building with clean room facilities and ancillary office involving addition of 1 no. of new built-in genset diesel tank (1500 litres) with no pump points on Lot 02406T MK 29 at 30 Tampines Industrial Avenue 3

    Tekscend Photomask Singapore Pte. Ltd. | Plant

    Nov 2025- Dec 2026

    Installation of Video Surveillance System for NSEWL

    Installation of video surveillance system for North-South and East-West lines

    Strides Engineering Pte Ltd | Railway

    Jun 2026 - Jun 2030

    RTS Woodlands

    DESIGN, MANUFACTURE, DELIVERY, TESTING & COMMISSIONING, INTERFACING, WARRANTY AND OTHER RELATED WORKS Of COMMUNICATIONS SYSTEM (COMMS) FOR RAPID TRANSIT SYSTEM (RTS) ASSETS FOR RTS LINK BETWEEN MALAYSIA - SINGAPORE

    H A S Energy Industrial (M) Sdn Bhd | Infrastructure

    Mar 2025 - Feb 2026

    BESS Kallang

    Design, Engineering, Procurement, Construction, Testing and Commissioning of a 9.6MW/12MWh grid-tied Battery Energy Storage System (BESS) at SPPA Kallang Industry 22kV Substation

    SP Energy Services Pte. Ltd | Energy Storage System

    Feb 2025 - Jun 2025

    Sembawang Airbase

    Turnkey Engineering, Procurement, Construction, Installation and Commissioning

    Sembcorp Solar | Solar PV

    20 Jan 2025 - 31 Dec 2030

    BESS Banyan

    Engineering, Procurement, Construction (EPC) Services for Battery Energy Storage System (BESS) In Banyan, Jurong Island, Singapore

    Sembcorp Cogen Pte Ltd | Energy Storage System

    Nov 2024 - Oct 2025

    Novartis

    To Supply Work, Labour and Materials

    Kurihara Kogyo Co Limited | Healthcare

    Apr 2024 - Dec 2025

    Intel Pelican (Penang) – HK26D_Indirect

    HK26D Electrical and ELV System

    Exyte Malaysia Sdn Bhd | Semiconductor

    Mar 2024 - Sep 2024

    JI – Plot 5-6 Solar Farm

    Construction of Solar Photovoltaic Project at Jurong Island

    China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd | Solar PV

    Feb 2024 - Oct 2024

    Daikin

    Fit-out Works Including Electrical Works

    Daikin | Building

    Jan 2024 - Sep 2024

    Novena – J342 MHA

    Additions and Alterations works at Ministry of Home Affairs

    Gammon | Building

    Oct 2023 - Jan 2024

    Micron DVR

    Cabling and Termination Work

    Micron | Semiconductor

    Aug 2023 - Jun 2024

    C853E CCL6

    CCL6 3 Stations CC30 CC31 and CC32 Power Supply Installation and Commissioning

    Siemens | Railway

    Aug 2023 - Dec 2024

    Soitec

    Design, Supply and Installation of Electrical System for SOITEC Pasir Ris Project

    Soitec | Semiconductor

    Jan 2024 - Dec 2024

    New AMAT TIC Building & Exisiting APC Building L2 SOC Facility Boxes

    Supply, Fabricate and Deliver Facility Boxes for New Building (Phase 1) Works

    Applied Materials | Semiconductor

    Nov 2023 - Jun 2024

    NUS Pneumatics – Deep Water Ocean Basin System

    Supply and Installation of Electrical and Air-Compressor System Works

    National University of Singapore | Building

    Aug 2018 - Jul 2020

    AMAT Extension Building & Data Center

    Supply and Installation of Builder, Mechanical, Electrical and Misc. Works

    Applied Materials | Semiconductor

    Feb 2020 - Ongoing

    Jurong Island Desalination Plant

    Supply and Installation of Electrical and Instrumentation System

    Public Utilities Board | Water Treatment

    Nov 2020 - May 2023

    Globalfoundries Fab7H

    General Electrical Works

    GLOBALFOUNDRIES | Semiconductor

    Dec 2021 - May 2023

    STMicroelectronics – SG Fab AMJ9 F1 Phase III Purion Cleanroom

    Supply and Installation of Electrical Works

    STMicroelectronics | Semi-con

    Aug 2022 - June 2023

    Siltronic Fab NEXT – F16A-1 & F16A-3

    Supply and Installation of Electrical Works

    Siltronic | Semi-con

    Nov 2022 - May 2023

    Global Switch’s Singapore Data Centre

    Supply and Installation of Cable Supporting System including HT riser, HT cable, Pilot Cable Installation, Termination and including Testing and Commissioning works. Proposed 6-Storey Single User Data Centre with Underground Fuel Storage Tanks on Plot A0066100 Lot 5685A MK 13 At Woodlands Avenue 12 (Woodlands Planning Area)

    Global Switch | Data Centre

    Jan 2018 - Oct 2018

    T275A Supply and Installation of Electrical Services for Mandai Depot

    Installation of Electrical Services

    LTA | Railway

    Sep 2017 - Mar 2019

    R152 – Track Circuit Refurbishment Works for North South East West Line

    Supply and Installation of Works for Track Circuit Refurbishment Works

    SMRT | Railway

    Oct 2018 - Jun 2021

    Qualcomm

    Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

    Qualcomm | Semi-con

    Jun 2014 - Dec 2020

    T275C Supply and Installation of Electrical Services for Thomson-East Coast Line Stage 3

    Supply and Installation of Electrical Works for T275C (TE14 &TE 20)

    LTA | Railway

    Jun 2018 - Dec 2022

    X-FAB 40K Expansion at Same Jaya Free Trade Zone, Kuching Sarawak

    Design, Supply, Installation Testing and Commissioning for Electrical, Instrument and Control System Works

    X-FAB | Semi-com

    Mar 2023 - Apr 2024

    Energy and Water Monitoring at Marina South Pier

    Supply and Installatation of Energy and Water Monitoring at Marina South Pier, Inclusive of 5-Year Comprehensive Maintenance Contract

    Maritime and Port Authority of Singapore | Monitoring system

    Feb 2022 - Feb 2027

    HydroElectric Power Plant at Aceh, Indonesia

    Supply and Installation for Electrical and Mechanical Works

    Peusangan Hydroeletric Power Plant | HydroElectric

    Dec 2022 - Jun 2023

    Rack Central Data Centre

    Electrical Works for New Generators

    Rack Central | Data Centre

    Sep 2022 - Jun 2023

    Reinstatement work to KPMG offices at Hong Leong Building

    Reinstatement to builder, electrical and ACMV works

    Hong Leong Finance | Building

    Aug 2022 - Jun 2023

    Paragon Shopping Centre A&A Works

    Supply and Installation for Electrical Works

    Paragon | Building

    Jan 2023 - May 2023

    Micron Semiconductor Asia Pte Ltd – Tools Hook Up and Construction Phase

    Supply & Install electrical supporting works, fit-up and hook-up of equipment, HT cabling works

    Mircon Plantconductr Asia Pte Ltd | Semi-con

    Feb 2016 - Mar 2023

    Proposed Fit Out Works to the 4th Storey at Existing 5 Storey Single User Factory for ASM Front End Manufacturing (SG) Pte Ltd

    Supply and Installation of Electrical Works

    ASM Front End Manufacturing (SG) Pte Ltd | Semi-con

    Apr 2022 - Dec 2022

    Sembcorp Energy Storage System 200MW/200MHh- Sakra and Banyan

    Electrical Works

    Sembcorp | Energy storage system

    November 2022

    CCD (Singapore) Pte Ltd

    Electrical and Instrumentation Cable Pulling Works

    CCD (Singapore) Pte Ltd | Oil & Gas

    Aug 2021 - Feb 2022

    C9355 – Solar System for Gali Batu Depot

    Supply and Installation of Solar System

    LTA | Solar PV

    Jan 2021 - Dec 2021

    Kranji Water Reclamation Plant

    Installation of High Tension Cable, Pilot cable and supporting system installation works

    PUB | Water Treatment

    Dec 2019 - Dec 2021

    SolarNova3- Selected Projects

    To design, install, test and commission serveral roof mounted photovoltaic power system under HDB Solarnova 3 Project

    MOE | Solar PV

    Mar 2019 - Dec 2021

    Solar Nova 2 – Palm View Primary School

    Supply & Install AC & DC Cabling and Supporting System Works

    MOE | Solar PV

    Jun 2020 - Sep 2021

    RF360 – New & Existing Cabling Dismantling & Diversion Works

    Supply and Installation of Electrical Works

    RF360 Singapore Pte Ltd | Semi-con

    Feb 2020 - Jul 2021

    Kerry Logistic (Various Site)

    Supply & Install M&E for A&A and maintenance works

    Kerry Logistics Centre | Warehouse

    Oct 2014 - Jun 2021

    CBTKD – Purpose Built Dormitory at Jalan Tukang

    Design and Installation of Electrical Works

    Jurong Town Corporation | Building

    Apr 2020 - Apr 2021

    ST AMK – AMJ9 F4 EP Upgrading Works

    Supply and Installation of Electrical Works

    ST Electronics | Semi-con

    Feb 2020 - Jul 2020

    Redlion Schenker

    To install, test and commission serveral roof mounted photovoltaic power system

    DB Schenker Red Lion | Warehouse

    May 2019

    Installation works of PV System for Grid-tied Solar Photovoltaic System for Vivocity

    Supply and Installation of Solar Photovolaic System Works

    Mapletree Investment | Solar PV

    Aug 2018 - Dec 2018

    Flextronic Additional and Alteration Works

    Supply and Installation of electrical works

    Flex Ltd | Semi-con

    Jun 2018 - Jun 2018

    Equinix @ Ayer Rajah Data Centre Additional and Alteration Works

    Installation of Electrical Works

    Equinix | Data Centre

    Apr 2018 - Jun 2018

    Shell Petrol Station Upgrading Works

    Supply and Installation of electrical works

    Shell plc | Oil & Gas

    Nov 2017 - May 2018

    3M Tuas – SG9 Line Process Electrical Installation

    Supply & Install electrical supporting works, fit-up and hook-up of equipment

    3M | Warehouse

    Oct 2016 - May 2018

    Upgrading Earthing System at M/S The Valspar (Singapore) Corporation Pte Ltd

    Earth Rite Plus P2 Static Grounding System Insallation Services

    The Valspar (Singapore) Corporation Pte Ltd | Building

    Nov 2017 - Dec 2017

    Guthrie FMC – A&A

    Supply & Install electrical works for Dock Leveler at Bay1 Repair works

    Guthrie Engineering | Building

    September 2017

    DBS Bank

    Supply & Install for Electrical Works

    DBS Bank | Building

    Apr 2017 - Aug 2017

    Linde Gas

    Supply & Install Instrumentation works

    Linde Gas | Oil & Gas

    July 2017

    RF360K3

    Supply & Installation of Electrical Services for hook-up of equipment

    Qualcomm | Semi-con

    Feb 2017 - Jun 2017

    Second Changi NEWater Plant

    Supply & Installation for instrumentation works

    PUB | Water Treatment

    Apr 2016 - Oct 2016

    Telin Singapore

    Supply & Install for Electrical Works

    Telin Singapore | Data Centre

    Jun 2016 - Aug 2016

    Abbott Singapore

    Supply & Install Instrument Valve for A&A works

    Abbott Singapore |

    Sep 2015 - Feb 2016

    Schlumberger

    Modification on existing panel wiring

    Schlumberger Limited | Building

    Nov 2015 - Nov 2015

    ASM

    Supply & Install M&E for A&A and maintenance works

    ASM | Semi-con

    Sep 2014 - Mar 2015

    Ardentec

    Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

    Ardentec | Semi-con

    Sep 2014 - Mar 2015

    Fluidigm

    Supply & Install M&E for new lab works and BMS System

    FLUIDIGM SINGAPORE PTE LTD | Building

    Sep 2014 - Mar 2015

    Grid-tied Solar Photovoltaic (PV) System at Aims Reit sites and Properties Project

    Supply Material and Labour for Installation Rooftop Photovoltaic System Works

    AIMS APAC REIT | Solar PV

    Oct 2022 - May 2023

    Tee Yih Jia

    Supply & Install for Electrical Works

    Tee Yih Jia Food Manufacturing Pte Ltd | Building

    July 2014 - Sep 2014

    TR286 – Design, Supply and Installation of Fixed Water-based Fire Fighting System for KPE & CTE

    Supply and Installation of Electrical, Surveillance and Control Works

    LTA | Tunnel

    Aug 2018 - Dec 2022

    Sembcorp Energy From Waste @ Sakra

    Supply & Installation for electrical works at Chimneys, to provide works, services, equipment & construction resources for the Electrical and C&I Erection Work

    Sembcorp | Energy from Waste

    Mar 2015 - Apr 2018

    Grid-Tied Solar Photovoltaic System at SPPA Substation Site and Properties Project (Phase-1A)

    Supply Material and labour for Installation Rooftop Photovoltaic System Works

    SP Group | Solar PV

    Mar 2023 - Aug 2023

     

  • Guthrie Engineering – installation of EV Charger

    Supply & Installation of EV Charger at Ulu Pandan Depot

    Guthrie Engineering (S) Pte Ltd | Building

    Dec 2025 - Jun 2026

    Daikin

    Fit-out Works Including Electrical Works

    Daikin | Building

    Jan 2024 - Sep 2024

    Novena – J342 MHA

    Additions and Alterations works at Ministry of Home Affairs

    Gammon | Building

    Oct 2023 - Jan 2024

    Soitec

    Design, Supply and Installation of Electrical System for SOITEC Pasir Ris Project

    Soitec | Semiconductor

    Jan 2024 - Dec 2024

    NUS Pneumatics – Deep Water Ocean Basin System

    Supply and Installation of Electrical and Air-Compressor System Works

    National University of Singapore | Building

    Aug 2018 - Jul 2020

    Global Switch’s Singapore Data Centre

    Supply and Installation of Cable Supporting System including HT riser, HT cable, Pilot Cable Installation, Termination and including Testing and Commissioning works. Proposed 6-Storey Single User Data Centre with Underground Fuel Storage Tanks on Plot A0066100 Lot 5685A MK 13 At Woodlands Avenue 12 (Woodlands Planning Area)

    Global Switch | Data Centre

    Jan 2018 - Oct 2018

    Rack Central Data Centre

    Electrical Works for New Generators

    Rack Central | Data Centre

    Sep 2022 - Jun 2023

    Reinstatement work to KPMG offices at Hong Leong Building

    Reinstatement to builder, electrical and ACMV works

    Hong Leong Finance | Building

    Aug 2022 - Jun 2023

    Paragon Shopping Centre A&A Works

    Supply and Installation for Electrical Works

    Paragon | Building

    Jan 2023 - May 2023

    Kerry Logistic (Various Site)

    Supply & Install M&E for A&A and maintenance works

    Kerry Logistics Centre | Warehouse

    Oct 2014 - Jun 2021

    Redlion Schenker

    To install, test and commission serveral roof mounted photovoltaic power system

    DB Schenker Red Lion | Warehouse

    May 2019

    Equinix @ Ayer Rajah Data Centre Additional and Alteration Works

    Installation of Electrical Works

    Equinix | Data Centre

    Apr 2018 - Jun 2018

    3M Tuas – SG9 Line Process Electrical Installation

    Supply & Install electrical supporting works, fit-up and hook-up of equipment

    3M | Warehouse

    Oct 2016 - May 2018

    Upgrading Earthing System at M/S The Valspar (Singapore) Corporation Pte Ltd

    Earth Rite Plus P2 Static Grounding System Insallation Services

    The Valspar (Singapore) Corporation Pte Ltd | Building

    Nov 2017 - Dec 2017

    Guthrie FMC – A&A

    Supply & Install electrical works for Dock Leveler at Bay1 Repair works

    Guthrie Engineering | Building

    September 2017

    DBS Bank

    Supply & Install for Electrical Works

    DBS Bank | Building

    Apr 2017 - Aug 2017

    Telin Singapore

    Supply & Install for Electrical Works

    Telin Singapore | Data Centre

    Jun 2016 - Aug 2016

    Schlumberger

    Modification on existing panel wiring

    Schlumberger Limited | Building

    Nov 2015 - Nov 2015

    Fluidigm

    Supply & Install M&E for new lab works and BMS System

    FLUIDIGM SINGAPORE PTE LTD | Building

    Sep 2014 - Mar 2015

    Tee Yih Jia

    Supply & Install for Electrical Works

    Tee Yih Jia Food Manufacturing Pte Ltd | Building

    July 2014 - Sep 2014

  • SB-SG-L3 expansion

    Cleanroom fit-out at L3, Level 3 Expansion Project- Electrical Work Package

    Silicon Box Pte Ltd | Semiconductor

    Apr 2026 - Nov 2026

    Tekscend Photomask – Cleanroom

    Additions and alterations to existing 2-storey single-user industrial building with clean room facilities and ancillary office involving addition of 1 no. of new built-in genset diesel tank (1500 litres) with no pump points on Lot 02406T MK 29 at 30 Tampines Industrial Avenue 3

    Tekscend Photomask Singapore Pte. Ltd. | Plant

    Nov 2025- Dec 2026

    Intel Pelican (Penang) – HK26D_Indirect

    HK26D Electrical and ELV System

    Exyte Malaysia Sdn Bhd | Semiconductor

    Mar 2024 - Sep 2024

    Micron DVR

    Cabling and Termination Work

    Micron | Semiconductor

    Aug 2023 - Jun 2024

    New AMAT TIC Building & Exisiting APC Building L2 SOC Facility Boxes

    Supply, Fabricate and Deliver Facility Boxes for New Building (Phase 1) Works

    Applied Materials | Semiconductor

    Nov 2023 - Jun 2024

    AMAT Extension Building & Data Center

    Supply and Installation of Builder, Mechanical, Electrical and Misc. Works

    Applied Materials | Semiconductor

    Feb 2020 - Ongoing

    Jurong Island Desalination Plant

    Supply and Installation of Electrical and Instrumentation System

    Public Utilities Board | Water Treatment

    Nov 2020 - May 2023

    Globalfoundries Fab7H

    General Electrical Works

    GLOBALFOUNDRIES | Semiconductor

    Dec 2021 - May 2023

    STMicroelectronics – SG Fab AMJ9 F1 Phase III Purion Cleanroom

    Supply and Installation of Electrical Works

    STMicroelectronics | Semi-con

    Aug 2022 - June 2023

    Siltronic Fab NEXT – F16A-1 & F16A-3

    Supply and Installation of Electrical Works

    Siltronic | Semi-con

    Nov 2022 - May 2023

    Qualcomm

    Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

    Qualcomm | Semi-con

    Jun 2014 - Dec 2020

    X-FAB 40K Expansion at Same Jaya Free Trade Zone, Kuching Sarawak

    Design, Supply, Installation Testing and Commissioning for Electrical, Instrument and Control System Works

    X-FAB | Semi-com

    Mar 2023 - Apr 2024

    Micron Semiconductor Asia Pte Ltd – Tools Hook Up and Construction Phase

    Supply & Install electrical supporting works, fit-up and hook-up of equipment, HT cabling works

    Mircon Plantconductr Asia Pte Ltd | Semi-con

    Feb 2016 - Mar 2023

    Proposed Fit Out Works to the 4th Storey at Existing 5 Storey Single User Factory for ASM Front End Manufacturing (SG) Pte Ltd

    Supply and Installation of Electrical Works

    ASM Front End Manufacturing (SG) Pte Ltd | Semi-con

    Apr 2022 - Dec 2022

    CCD (Singapore) Pte Ltd

    Electrical and Instrumentation Cable Pulling Works

    CCD (Singapore) Pte Ltd | Oil & Gas

    Aug 2021 - Feb 2022

    Kranji Water Reclamation Plant

    Installation of High Tension Cable, Pilot cable and supporting system installation works

    PUB | Water Treatment

    Dec 2019 - Dec 2021

    RF360 – New & Existing Cabling Dismantling & Diversion Works

    Supply and Installation of Electrical Works

    RF360 Singapore Pte Ltd | Semi-con

    Feb 2020 - Jul 2021

    ST AMK – AMJ9 F4 EP Upgrading Works

    Supply and Installation of Electrical Works

    ST Electronics | Semi-con

    Feb 2020 - Jul 2020

    Flextronic Additional and Alteration Works

    Supply and Installation of electrical works

    Flex Ltd | Semi-con

    Jun 2018 - Jun 2018

    Shell Petrol Station Upgrading Works

    Supply and Installation of electrical works

    Shell plc | Oil & Gas

    Nov 2017 - May 2018

    Linde Gas

    Supply & Install Instrumentation works

    Linde Gas | Oil & Gas

    July 2017

    RF360K3

    Supply & Installation of Electrical Services for hook-up of equipment

    Qualcomm | Semi-con

    Feb 2017 - Jun 2017

    Second Changi NEWater Plant

    Supply & Installation for instrumentation works

    PUB | Water Treatment

    Apr 2016 - Oct 2016

    Abbott Singapore

    Supply & Install Instrument Valve for A&A works

    Abbott Singapore |

    Sep 2015 - Feb 2016

    ASM

    Supply & Install M&E for A&A and maintenance works

    ASM | Semi-con

    Sep 2014 - Mar 2015

    Ardentec

    Supply & Install M&E for A&A works, Fit-up & Hook-up of equipment and maintenance works

    Ardentec | Semi-con

    Sep 2014 - Mar 2015

    Sembcorp Energy From Waste @ Sakra

    Supply & Installation for electrical works at Chimneys, to provide works, services, equipment & construction resources for the Electrical and C&I Erection Work

    Sembcorp | Energy from Waste

    Mar 2015 - Apr 2018

  • Installation of LED lights and fittings – Strides

    Strides Engineering Pte Ltd | Railway

    Feb 2026 - Jun 2026

    Kandenko – Changi East Depot

    Supply, Engineering, Delivery, Installation, Testing and Commissioning of Electrical Works for Contract CR175A Supply and Installation of Electrical Services For Changi East Depot.

    Kandenko Co., Ltd | Railway

    Jan 2027- Dec 2029

    Installation of Video Surveillance System for NSEWL

    Installation of video surveillance system for North-South and East-West lines

    Strides Engineering Pte Ltd | Railway

    Jun 2026 - Jun 2030

    RTS Woodlands

    DESIGN, MANUFACTURE, DELIVERY, TESTING & COMMISSIONING, INTERFACING, WARRANTY AND OTHER RELATED WORKS Of COMMUNICATIONS SYSTEM (COMMS) FOR RAPID TRANSIT SYSTEM (RTS) ASSETS FOR RTS LINK BETWEEN MALAYSIA - SINGAPORE

    H A S Energy Industrial (M) Sdn Bhd | Infrastructure

    Mar 2025 - Feb 2026

    Novartis

    To Supply Work, Labour and Materials

    Kurihara Kogyo Co Limited | Healthcare

    Apr 2024 - Dec 2025

    C853E CCL6

    CCL6 3 Stations CC30 CC31 and CC32 Power Supply Installation and Commissioning

    Siemens | Railway

    Aug 2023 - Dec 2024

    T275A Supply and Installation of Electrical Services for Mandai Depot

    Installation of Electrical Services

    LTA | Railway

    Sep 2017 - Mar 2019

    R152 – Track Circuit Refurbishment Works for North South East West Line

    Supply and Installation of Works for Track Circuit Refurbishment Works

    SMRT | Railway

    Oct 2018 - Jun 2021

    T275C Supply and Installation of Electrical Services for Thomson-East Coast Line Stage 3

    Supply and Installation of Electrical Works for T275C (TE14 &TE 20)

    LTA | Railway

    Jun 2018 - Dec 2022

    CBTKD – Purpose Built Dormitory at Jalan Tukang

    Design and Installation of Electrical Works

    Jurong Town Corporation | Building

    Apr 2020 - Apr 2021

    TR286 – Design, Supply and Installation of Fixed Water-based Fire Fighting System for KPE & CTE

    Supply and Installation of Electrical, Surveillance and Control Works

    LTA | Tunnel

    Aug 2018 - Dec 2022

  • Solar Photovolataic project for Roof Package at SBAB

    A grid connected photovaltaic power systems with a nominal capacity of 21.89MWp at SBAB and Dieppe barrrack

    Sembcorp Solar Singapore Pte Ltd | Solar PV

    Nov 2025- Dec 2026

    BESS Kallang

    Design, Engineering, Procurement, Construction, Testing and Commissioning of a 9.6MW/12MWh grid-tied Battery Energy Storage System (BESS) at SPPA Kallang Industry 22kV Substation

    SP Energy Services Pte. Ltd | Energy Storage System

    Feb 2025 - Jun 2025

    Sembawang Airbase

    Turnkey Engineering, Procurement, Construction, Installation and Commissioning

    Sembcorp Solar | Solar PV

    20 Jan 2025 - 31 Dec 2030

    BESS Banyan

    Engineering, Procurement, Construction (EPC) Services for Battery Energy Storage System (BESS) In Banyan, Jurong Island, Singapore

    Sembcorp Cogen Pte Ltd | Energy Storage System

    Nov 2024 - Oct 2025

    JI – Plot 5-6 Solar Farm

    Construction of Solar Photovoltaic Project at Jurong Island

    China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd | Solar PV

    Feb 2024 - Oct 2024

    Energy and Water Monitoring at Marina South Pier

    Supply and Installatation of Energy and Water Monitoring at Marina South Pier, Inclusive of 5-Year Comprehensive Maintenance Contract

    Maritime and Port Authority of Singapore | Monitoring system

    Feb 2022 - Feb 2027

    HydroElectric Power Plant at Aceh, Indonesia

    Supply and Installation for Electrical and Mechanical Works

    Peusangan Hydroeletric Power Plant | HydroElectric

    Dec 2022 - Jun 2023

    Sembcorp Energy Storage System 200MW/200MHh- Sakra and Banyan

    Electrical Works

    Sembcorp | Energy storage system

    November 2022

    C9355 – Solar System for Gali Batu Depot

    Supply and Installation of Solar System

    LTA | Solar PV

    Jan 2021 - Dec 2021

    SolarNova3- Selected Projects

    To design, install, test and commission serveral roof mounted photovoltaic power system under HDB Solarnova 3 Project

    MOE | Solar PV

    Mar 2019 - Dec 2021

    Solar Nova 2 – Palm View Primary School

    Supply & Install AC & DC Cabling and Supporting System Works

    MOE | Solar PV

    Jun 2020 - Sep 2021

    Installation works of PV System for Grid-tied Solar Photovoltaic System for Vivocity

    Supply and Installation of Solar Photovolaic System Works

    Mapletree Investment | Solar PV

    Aug 2018 - Dec 2018

    Grid-tied Solar Photovoltaic (PV) System at Aims Reit sites and Properties Project

    Supply Material and Labour for Installation Rooftop Photovoltaic System Works

    AIMS APAC REIT | Solar PV

    Oct 2022 - May 2023

    Grid-Tied Solar Photovoltaic System at SPPA Substation Site and Properties Project (Phase-1A)

    Supply Material and labour for Installation Rooftop Photovoltaic System Works

    SP Group | Solar PV

    Mar 2023 - Aug 2023

Scroll to Top